I have added some details to the roof of the main building. These details include a water tower, a smoke stack, a roof access door, and some other small details.
The stack is located to try and disguise the wall corner.
I may add additional details to this roof but I do not want it to look too busy.
My next project is the last building in the complex on the left of the main building. It will be a wood structure. This will likely be slowed by the holidays.
No comments:
Post a Comment