Modeling and modeling ideas for my 1939 era HO model railroad - the Royal Oak & Southern, plus other things I find of interest. Stan Knotts.
Thursday, August 20, 2015
Factory building #1 complete
The factory building #1 is now complete - I think. Building #2 will occupy the footprint identified by the manila colored cardstock. The alley runs between the two buildings. The chimney goes in the corner - the right side will be against the wall. There will b e two elevated walkways between the buildings. One will attach at the third floor level to the left of the vertical vent, and the other at the forth floor level above the right set of windows. All lower floor windows have been fitted with metal security grills.
Below is an updated view of the left side of the building.
Progress on building #2 is in progress. I am still contemplating what this factory manufactures.
No comments:
Post a Comment