Next I will install this structure resulting in all structures installed. Then I need to finish adding scenery and some details.
Modeling and modeling ideas for my 1939 era HO model railroad - the Royal Oak & Southern, plus other things I find of interest. Stan Knotts.
Tuesday, July 21, 2020
Extraction plant office
I have completed the office for the extraction plant which is the last structure for this small industry. The windows for this model are a combination of cast metal on the front and back and plastic on the sides. I do not know the manufacturer of the cast metal windows as they were among many cast metal windows and doors in a box of parts.
The chimney on the left was made using a plastic sprue with a metal top cap. The roof was shingled.
The right side has a shed with an open door. Inside the shed are various details including boxes, barrels and a figure.
Above is a view of the rear.
Next I will install this structure resulting in all structures installed. Then I need to finish adding scenery and some details.
Next I will install this structure resulting in all structures installed. Then I need to finish adding scenery and some details.
No comments:
Post a Comment