Monday, March 9, 2015

Bolt and Nut factory progress

I have mostly completed the walls of the factory, but still no back or roof.  I still have some work to do on this part.


The fire escape is a Walthers kit that was part of the series that I used for the walls.  The platform on the left is strip wood.  The center entrance is a mix of materials.


The right wall is blank as the office structure will be attached there.

After I install the roof I will add details on it.  I still need to create some signs and possibly add some posters.  The back is 13 inches long and the structure is 6 inches high.


No comments:

Post a Comment