Next I will be building the structure that adjoins the right side of building #1.
Modeling and modeling ideas for my 1939 era HO model railroad - the Royal Oak & Southern, plus other things I find of interest. Stan Knotts.
Thursday, May 4, 2017
Dredge company bldg # 1 complete
I have completed the dredge company building #1. It is not yet installed on the layout although one photo below shows it sitting on the layout. There are two more buildings to be done for this industry.
There is a boiler house on the left of the building and a small coal bin beside it. There is also an engine in the boiler house to power the hoist engine and the lights. I have added a grab bucket inside the front area of building # 1. The grab bucket was made from card stock, paper and wire.
Above is a rear view showing the loading dock.
Above shows the right side of the building.
Above you see building # 1 sitting in place on the layout.
Next I will be building the structure that adjoins the right side of building #1.
Next I will be building the structure that adjoins the right side of building #1.
No comments:
Post a Comment