Now to install it on the layout behind the boarding house. It provides a great view for the boarding house occupants sitting on their back porches.
Modeling and modeling ideas for my 1939 era HO model railroad - the Royal Oak & Southern, plus other things I find of interest. Stan Knotts.
Thursday, October 19, 2017
Brush factory complete
My brush factory is complete. Next I need to install it on the layout with surrounding scenery and details. The loading docks will be trackside. The boiler house is the brick structure on the left and the shed at the back, right is for storage of materials such as hog bristles and wood for handles. The sacks on the dock contain hog bristles.
This was a fun build.
This rear, side view shows the various doors and the fire hose on the wall.
Above is the opposite rear, side view.
Now to install it on the layout behind the boarding house. It provides a great view for the boarding house occupants sitting on their back porches.
Now to install it on the layout behind the boarding house. It provides a great view for the boarding house occupants sitting on their back porches.
No comments:
Post a Comment