That finishes this model. I am doing the planning for the next model.
Modeling and modeling ideas for my 1939 era HO model railroad - the Royal Oak & Southern, plus other things I find of interest. Stan Knotts.
Welcome
This blog presents my thoughts, information and activities in my model railroading world.
Sunday, October 1, 2017
Boarding house installed
The boarding house is now installed with additional details and scenery. It is at the outside corner of the layout extension so I backed up the photos with a cloudy sky scenery board to avoid having the layout room as part of the photos.
This is a view of the front with a tree in the front yard and an auto at the side of the house. You can see some of the inside of the fence that boarders one side and the back.
Here is a view of the back and the outside of the fence. I added signs to the fence. I also added some laundry hanging on the upper level, a rag on the second level railing along with a potted plant and some "stuff" on the lower level which cannot be seen in this photo.
Here is another slightly different view of the back.
That finishes this model. I am doing the planning for the next model.
That finishes this model. I am doing the planning for the next model.
Tuesday, September 26, 2017
Boarding house model
My boarding house model is mostly complete. My inspiration for this model was an old photo of a similar view of what I built for the back of my model. Some time ago I built a model of a rooming house. The difference between a rooming house and a boarding house is mostly that the boarding house provides one or more meals as I understand it. This boarding house provides rooms for some workers at the bobbin mill and the businesses along the water front.
The platform levels and stairs took some time. I plan to add more details on the platforms.
Above you see the front which is very plain. The front and rear bases are made from card stock which will be flattened when I install the structure on the layout.
Above is another view of the back directly in front of the camera - just another view. On the lower left is a small storage shed.
Monday, September 18, 2017
Bobbin mill installed
The bobbin mill is now installed on the layout with some scenery added. The near end has piles of wood chips from the bobbin turnings, similar to what the prototype had. I will be adding more scenery along with the next model I am building.
Next model
My next model will be a boarding house adjacent to the bobbin mill. That will give some of the bobbin mill workers a place to live. The Glen bobbin mill had a boarding house near by but it was not very interesting. My boarding house is a 3 story building with an interesting back that will have a porch on each level with stairs and lots of details. I have a rough start with the front and two sides - lots more details to be added including the corner posts.
I am also building a Jordan Products model T Ford stake truck to serve the bobbin mill.
Some personal railroad history.
Years ago I belonged to the Three Rivers Narrow Gauge Historical Society which dealt with narrow gauge railroads the used to serve the Pennsylvania and Ohio areas. All of those roads had ceased to exist and had very little remaining vestiges. We used to have annual tours to visit the areas where the railroads ran, About the most we ever saw was an occasional bridge, barren right of way (some vestiges of ties and track, and a box car used as a shed. We had fun any way. The society published a quarterly newsletter called Light Iron and Short Ties - L.I.S.Y. (I have the issues published while I was a member). The society eventually folded due mostly to lack of new information. I was looking trough the newsletters recently and remembering the good times.
My next model will be a boarding house adjacent to the bobbin mill. That will give some of the bobbin mill workers a place to live. The Glen bobbin mill had a boarding house near by but it was not very interesting. My boarding house is a 3 story building with an interesting back that will have a porch on each level with stairs and lots of details. I have a rough start with the front and two sides - lots more details to be added including the corner posts.
Some personal railroad history.
Years ago I belonged to the Three Rivers Narrow Gauge Historical Society which dealt with narrow gauge railroads the used to serve the Pennsylvania and Ohio areas. All of those roads had ceased to exist and had very little remaining vestiges. We used to have annual tours to visit the areas where the railroads ran, About the most we ever saw was an occasional bridge, barren right of way (some vestiges of ties and track, and a box car used as a shed. We had fun any way. The society published a quarterly newsletter called Light Iron and Short Ties - L.I.S.Y. (I have the issues published while I was a member). The society eventually folded due mostly to lack of new information. I was looking trough the newsletters recently and remembering the good times.
Wednesday, September 13, 2017
Bobbin mill coppice barn
I have completed the coppice barn for the bobbin mill and attached it. The coppice barn is for storage (and sometimes debarking) of the hard wood for making the bobbins. Although it is somewhat difficult to see in the photo, I have detailed the interior of the coppice barn with stacks of logs (sticks I gathered in my back yard), a scratch built dolley next to the ramp into the mill, a figure hoisting a log, a log cart, and a scratch built work bench.
There are a few tools on the work bench and a saw leaning on the front of it. The roof of the barn was made using the venerable Campbell shingles.
In the photo above you can see a photo of the Glen bobbin mill which I used as a guide in making my model. I am guessing the elevated covered wooden shaft rising from the shed to the upper part of the boiler room was for moving wood chips for use in heating the boiler. There will be piles of wood chips at the base of the building once it is installed on the layout.
Above you can see the rear of the structure and the rail siding that serves it.
Above is an overall view of the rear of the building.
Next I need to add some signs and install the building on the layout with lots of detritus around it and maybe a truck delivering logs.
Next I need to add some signs and install the building on the layout with lots of detritus around it and maybe a truck delivering logs.
Tuesday, September 5, 2017
Bobbin mill complete
The bobbin mill is mostly complete (there are a few details to be added including signs and scenery). The photos were taken on the layout approximately where the mill will be installed but it is not yet installed. This mill was modeled based on a very small photo of the Glen Bobbin Company that once existed in South Hiram, Maine, I tried doing some research on it but found very little. I think it was built about 1920 and at one time the president was Charles Fox, possibly related to one of my wife's family members who live in Maine.
Above is a rear view with the attached engine house at the right with the stack above it. The building is wood style with a stone foundation.
Above is a track-side view.
The side at the right will have a "shed" attached adjacent to the track where the raw wood stock is stored. Bobbins where made from various types of hard wood. This type of storage was referred to as a coppice barn. I will make the coppice barn next.
Above is a chart from an old book that shows a variety of bobbin styles, They came in a vast variety of styles and sizes.
Tuesday, August 29, 2017
Bobbin mill start
Here is the basic start to the bobbin mill - just the basic walls, windows and doors. Wood bobbins were the staples of the fabric mills in the 1800s and early 1900s. By the mid 1900s they were replaced by new technologies. Wood bobbins were created to collect the thread for fabrics. They twisted and spun on spindles to collect the threads. Bobbins came in many shapes and sizes depending on the needs and preferences. They were made from a variety of hard woods. The bobbin had a cylindrical center which had a hole bored into it and a wider flat cylindrical disk at each end. Some bobbins had metallic ends. Many years ago I became fascinated with wood bobbins and bought several of various sizes. Eventually I got rid of most of them retaining only two which my wife uses to hold large candles for display.
Here are the two bobbins sitting on the flat area in front of the fireplace in our family room.
My bobbin mill is an old style wood structure with a stone foundation. At this point I have built the basic walls with the foundation. There will be many details added, especially at the back of the building,
Above is a view of the back. The projection at the right is the boiler room. The boiler is wood fired as there is an ample supply of wood debris.
Above is the front view which will be track-side. There will be a loading dock. All windows and doors are commercial parts, mostly Tichy.
I will be bob bob bobbin along building this industry. I just had to make that pun - 😀
My bobbin mill is an old style wood structure with a stone foundation. At this point I have built the basic walls with the foundation. There will be many details added, especially at the back of the building,
I will be bob bob bobbin along building this industry. I just had to make that pun - 😀
Monday, August 21, 2017
Furniture factory installed
I have installed and added scenery for the furniture factory. I am still considering what to name it so signs will be added later. Over the last week I was also constructing an SS Ltd light delivery truck which you can see backed up to the platform on the right side.
The factory is located in front of the building under destruction which you can see on the right side of the furniture factory.
This view shows the delivery truck with a piece of furniture loaded in the back.
I will probably add more scenery as time goes by.
Next Model.
I have decided what my next model will be. It will be something I doubt many if any modelers have modeled. It will be a Bobbin Mill - a mill that creates wooden bobbins for use in weaving factories for the textile industry. Bobbin mills mostly disappeared by the mid-1900's due to changes in technology, but since I model 1939 they still existed. In my next post I will discuss details on a typical bobbin mill and some background information.
I will probably add more scenery as time goes by.
Next Model.
I have decided what my next model will be. It will be something I doubt many if any modelers have modeled. It will be a Bobbin Mill - a mill that creates wooden bobbins for use in weaving factories for the textile industry. Bobbin mills mostly disappeared by the mid-1900's due to changes in technology, but since I model 1939 they still existed. In my next post I will discuss details on a typical bobbin mill and some background information.
Subscribe to:
Posts (Atom)




















