The right side will abut to the drying shed previously built. On the left side will be a small office building adjoining the main structure. The second floor will be on the right side of the roof covering only about half of the main floor.
The building finish is merely the standard ink/alcohol stain. The windows are Grandt Line. There is a door in the indentation at the right front where the dried "bolts" (barrel wood) is moved into the building.
No comments:
Post a Comment