I have been working on two other small projects - an old SS Ltd light delivery truck (kit developed in 1975) and an old Gould (now Tichy) plastic flat car kit. The SS Ltd kit is a pain but the Gould is an easy build. I am thinking about what structure to build next - I am toying with several ideas.
Modeling and modeling ideas for my 1939 era HO model railroad - the Royal Oak & Southern, plus other things I find of interest. Stan Knotts.
Welcome
This blog presents my thoughts, information and activities in my model railroading world.
Wednesday, January 14, 2015
Ice machinery factory installed on layout
I have installed the completed (is anything really completed) factory on my layout. I still need to do some work on the scenery around the factory but I wanted to get this posted.
There is no scenery or structure on either side of the factory at this time and I am not yet sure what will go there. I still have a good amount of layout space on this layout extension so lots of room for more structures.
I have been working on two other small projects - an old SS Ltd light delivery truck (kit developed in 1975) and an old Gould (now Tichy) plastic flat car kit. The SS Ltd kit is a pain but the Gould is an easy build. I am thinking about what structure to build next - I am toying with several ideas.
I have been working on two other small projects - an old SS Ltd light delivery truck (kit developed in 1975) and an old Gould (now Tichy) plastic flat car kit. The SS Ltd kit is a pain but the Gould is an easy build. I am thinking about what structure to build next - I am toying with several ideas.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment