Welcome

This blog presents my thoughts, information and activities in my model railroading world.

Wednesday, November 28, 2012

Norfolk & Southern steel flat car 1894

The Norfolk & Southern railroad steel flat car below as illustrated in 1894.  The Norfolk & Southern started as the Elizabeth City & Norfolk chartered in 1870 became the Norfolk & Southern railroad in 1883.  It seems to be a remote ancestor of the current Norfolk Southern.

Their first attempt at a metal flat used an iron tube frame which apparently was not up to heavy weights.  This car used steel tubular frame that was more successful.  The photo shows it hauling 147 car wheels weighing 80,000 pounds.  The steel tubes were bolted together and used "gas pipes" between the steel tubes.  The car was 34 foot long.  This was an experimental car.


This would make a neat model.


Saturday, November 24, 2012

Portable excavator & screening machinery

Back on September 6th I posted an image of a Fairbanks-Morse ballast loader vintage 1908.  Here are two similar machines from a 1906 Jeffrey Elevator & Conveyor catalog.  These machines are fascinating and as crude as they appear, they were better than hand loading which had been the standard.




These seem to be different machines though they could be just modifications of the same design.

I am still thinking about my next model build, although I just finished constructing a top superstructure for a  railroad bridge that has been on  the layout for over a year with only the bridge "floor" and track in place.  

Saturday, November 17, 2012

Finished barrel factory model

The barrel factory is finished and installed on the layout.  I will probably do some more detailing around the factory but essentially it is done.  This has been an interesting project.

The barrel making process is interesting.  The green wood (bolt) is delivered to the factory by rail and dried in the area behind the factory (real small on my model).  When reasonably dry it is run through the drying shed on a rail trolley.  It then enters the factory where the wood is split and cut into staves.  Heading pieces are also cut and when the barrel is assembled, a groove called a "crozing" is cut into each end of the staves to allow the heading to nestle tightly into it.  The barrel is then formed and hoops of wood (or more recently metal) are fastened around the barrel to make it tight.  This is a very abbreviated version of the process but gives you the idea.

Below are photos of the barrel factory on my layout.


The industry is located at an inside corner of the layout thus the rear and right side are not viewable.  You can see a truck at the left.  I added a truck loading door on the side of the factory behind the office.  You can also see the boiler house stack behind the small water tank on the factory roof.


This view is as good as it gets for viewing the barrel conveyor and the trackside platform on the right where the barrels are loaded on a rail car.  I added some wood scrap behind the factory which can be seen just beyond the office.  I also placed a variety of vents and details on the factory roof for visual interest.  With most of our model structures the most prominent feature we see is the roof.

In answer to the comment/question, the sign on the front of the factory is dry transfers on a wood strip and the sign on the office roof was made on the computer.



Friday, November 9, 2012

Barrel conveyor model

Most of the effort on this barrel conveyor was the research and design.  When you buy a kit to build, all of that has been done for you to the best of the ability of the manufacturer.  Then if they provide good instructions (not always the case) you just have to follow the instructions to build your model.  When scratch building models such as this you are on your own with whatever prototype information you can find as well as some reasonable understanding of how machinery works.  This conveyor model is based on information from a vintage engineering catalog.  I posted photos several weeks ago of barrel conveyors and I used those photos as my guide and inspiration.




The conveyor is made from strip wood stained with my usual india ink and alcohol mixture.  I made the chain tracks from a single strand of plastic window screen.  The curved barrel supports on the tracks were made from cast metal passenger car roof beading for older style passenger cars.  Unfortunately the second photo is not very clear.  There is a short piece of the screen strip used for the chain tracks lying next to the conveyor.  At least one model manufacturer makes a sprocket chain which they market for loco mechanisms but the cost is quite high.



I added a third photo above to show the sprocket chain (made from screen wire) better.  I also added a barrel being held by the curved supports.

I did not model the gears and machinery at the upper end of the conveyor as that is inside the upper factory door and cannot be seen from the layout aisle.  I used to model details that can not be seen but have given up doing that.  Some of my structures do not have any detail on the side that cannot be seen.

My next work on the barrel factory will be to install it on the layout and detail the surroundings.



Friday, November 2, 2012

Barrel company office

This is the office for the barrel company.  It attaches to the left side of the barrel factory.  It is heavily weathered and has not seen paint for many years.  The awning covers the window that gets the most sun.


The construction is clapboard siding to contrast with the rougher board and batten of the factory.  The roofing is tar paper as the slope of the roof is too slight to use shingles.

Next I will build the barrel conveyor that moves the barrels from the second floor storage area to the outside loading dock.  I showed examples of these conveyors in an earlier post.

Saturday, October 27, 2012

Barrel factory progress

I have added the second story and a bunch of detail.  The second story is the finished barrel storage area.  The first photo shows the left side of the factory.  I have yet to make the office which will adjoin the left side of the lower area and will be a small clapboard structure.  Also there will be a stack at the back adjoining the boiler house.


The second photo shows the right side of the factory with the drying shed attached.  The large opening on the upper story is where the barrel conveyor will exit the building to carry the barrels to the loading dock on the other side of the rail siding.


I was at the Timonium Maryland train show this morning.  The October show there is usually their biggest but this one was disappointingly smaller.  I think most train shows, as well as hobby shops,  are losing their appeal with the ready access to products via the Internet.  I do almost all of my shopping by mail, though most of my model railroad purchases are merely paint, wood and detail parts since I only do scratch building these days.  When I go to train shows these days it is mostly for socializing.

Thursday, October 18, 2012

Barrel Factory main level progress

This has gone somewhat slow but the basic main level of the barrel factory is mostly complete.  The roof is still in progress and the wall caps need to be added.  The brick portion in the center rear is the boiler house which provides the power and heat for the facility along with the engine room buried inside the main floor in front of the boiler house.  The side you cannot see has minimal detail as it will not be seen from the edge of the layout.


The right side will abut to the drying shed previously built.  On the left side will be a small office building adjoining the main structure.  The second floor will be on the right side of the roof covering only about half of the main floor.  

The building finish is merely the standard ink/alcohol stain.  The windows are Grandt Line.  There is a door in the indentation at the right front where the dried "bolts" (barrel wood) is moved into the building.