Welcome

This blog presents my thoughts, information and activities in my model railroading world.

Friday, March 13, 2015

Bolt& nut factory complete

I have completed the Bolt & Nut factory (except the office addition).  This is one of the largest of the structures on my layout addition.


I added and detailed the roof, with a sign, a chimney, two vents and a wood style louvred vent.  I added several details on the loading dock including an open barrel, a box, a figure carrying a box, a fire extinguisher on the wall next to the door, and a rag hanging on the railing.


I added some weathering and some bits of vegetation at the base.

The office addition will be attached to the right side of the structure and has a different look.

No comments: