I have decided my next project will be a machinery repair shop with an outside yard containing machinery (tractors, trucks, etc) awaiting repair or in progress of being repaired. The yard area will be fenced in and there will be a structure with probably a covered, open work area. I have not yet done a design but I am in the process of constructing some machinery for the yard. Doing the machinery will be a slow process but the amount of detail should make this interesting.
Modeling and modeling ideas for my 1939 era HO model railroad - the Royal Oak & Southern, plus other things I find of interest. Stan Knotts.
Welcome
This blog presents my thoughts, information and activities in my model railroading world.
Monday, October 27, 2014
Chair company installed
I have installed the chair company model with an elevated passageway on the left adjoining the warehouse. The chair company has an arrangement with the warehouse for storage of products. Underneath the elevated passageway is a mirror to give the impression the road underneath goes on behind the structures.
I added some scenery in front of the structures along the wall. There is a truck with a load of wood at the chair company loading door. At the lower left of this photo I installed a trackside loading dock for rail shipments as neither the chair company nor the warehouse have rail side loading docks.
I have decided my next project will be a machinery repair shop with an outside yard containing machinery (tractors, trucks, etc) awaiting repair or in progress of being repaired. The yard area will be fenced in and there will be a structure with probably a covered, open work area. I have not yet done a design but I am in the process of constructing some machinery for the yard. Doing the machinery will be a slow process but the amount of detail should make this interesting.
I have decided my next project will be a machinery repair shop with an outside yard containing machinery (tractors, trucks, etc) awaiting repair or in progress of being repaired. The yard area will be fenced in and there will be a structure with probably a covered, open work area. I have not yet done a design but I am in the process of constructing some machinery for the yard. Doing the machinery will be a slow process but the amount of detail should make this interesting.
Monday, October 20, 2014
Chair company model
For this model I started with a DPM Laube's Linen Mill kit and used two and a half walls of the kit. These kits are cheap and simple, and I have several of their kits on the shelf I never used. I named the business Benenati's for a friend.
I added a wood addition in the front. This model will be against the wall between the warehouse and the bilge barrel company. There will be an elevated walkway between the chair company and the warehouse after installation. That walkway enables the chair company to store chair products in the warehouse.
The details on the roof include a chimney, a roof-top stairway to the lower level, a vent, a chair and a small pile of lumber.
The chair company has been having business difficulties due to competition from more modern chair and furniture companies, but the trucking activity is still busy - wonder what may be going on?
Once I install the structure on the layout I will post a photo with the scenery details.
Over the last few weeks I was creating a clinic for the MER convention held this last weekend, so that slowed my progress on the model.
Once I install the structure on the layout I will post a photo with the scenery details.
Over the last few weeks I was creating a clinic for the MER convention held this last weekend, so that slowed my progress on the model.
Tuesday, October 7, 2014
Warehouse completed
I have completed the warehouse model, finally. I was going to post this yesterday but had some computer problems. I placed some boxes and stuff on the loading dock, along with two figures. There is also a figure on the second floor walkway.
The left side has a billboard - appropriately advertising a rat destroying product.
The right side has a gap in the siding where I will be attaching a walkway to the next structure.
There is a small ladder at the end of the platform. Formal access to the building is on the other side (not modeled since this goes against the wall).
I am now contemplating what my next model will be.
I am now contemplating what my next model will be.
Sunday, September 28, 2014
Warehouse delivering hoist
Due to the board by board building method I am using for this model, which includes cutting the strips, painting them unevenly to look weathered, then cutting to length and gluing to the structure - one at a time. After the boards are installed I use a single edge razor blade to scratch in wood grain. That is all still in progress. Meanwhile I have installed 2nd and 3rd floor delivery doors with a hoist at the top.
Below are several vintage photos of structures with delivery hoists.
I have tried to capture the look of these hoists. The hoists employ an I beam extending from the top of the top doorway. Inside is an electric motor to raise and lower the hook.
Tuesday, September 23, 2014
Warehouse model start
This model is taking a lot of time, both due to the design process and the tedious build process. Below is the preliminary sketch and the card stock mock-up. This model replicates an old warehouse originally served by horse and wagon. This will not be rail-served.
I have made some changes from these early preliminary design products. This model is primarily being built using card stock products with wood bracing.
Below is the initial frame.
And the next photo shows the model as it is tonight. I decided to do this post since this model is progressing so slowly. The siding is clapboard made board by board using quality 65lb weight card stock paper bought at a craft store. I chose brown paper so there will be no white edges when cut. I sprayed one side of the paper with gray paint, then cut the paper into board width strips. I then painted over the gray with white acrylic paint leaving gaps to simulate peeling paint and weathered boards. I still need to engrave some texture into the boards to simulate wood grain and then more weathering. Preparing all of these individual boards has been very time consuming.
As you can see there will be a loading platform on the lower right. On the upper mid-left is an extension for a set of stairs between the second and third floor. At the top of the extreme left will be a loading door with a hoist. On the right second floor is an open walkway (I have not yet installed the back of that walkway).
The is of course another relief structure that will be installed against the wall to the right of my tree.
Below is the initial frame.
The is of course another relief structure that will be installed against the wall to the right of my tree.
Tuesday, September 16, 2014
Modeling a tree against the wall
Rather than placing a continuous row of structures against the wall on the layout, I decided to have a 3-D tree separating the structures. This tree is between the varnish factory and the warehouse I am now constructing. Instead of painting a tree on the wall I constructed a 3-D tree. My first step was to paint the tree background on a section of card stock.
I glued a half tree trunk and a few branches to the painted background on this section of card stock. The painted area is just a bunch of varied green blotches using acrylic craft paints. The tree trunk and branches are from sticks from the garden. Even though the layout section is only two feet deep it is easier to do the initial work off the layout.
The structure to the left is the end of the varnish company warehouse. The left base of the tree card stock was slipped behind the fence. The warehouse I am building will cover the right edge of the tree card. The foliage is Silflor summer Beech tree material cut into small pieces and glued to the tree background. After the initial foliage was added I added more branches projecting outward and the added more foliage to achieve a layered effect. It looks good to me. I placed an outhouse near the base of the tree.
I really like the Silflor products as well as other European company scenery products. I can recall the early days of my modeling when my scenery products consisted mostly of Lichen and dyed sawdust. I also use a lot of natural scenery items such as dirt and small twigs. The dirt needs to be finely sifted and the color can be varied by adding appropriate amounts of colored chalk dust. When gathering scenery elements outside it is important to ensure there are no bugs in them.
I really like the Silflor products as well as other European company scenery products. I can recall the early days of my modeling when my scenery products consisted mostly of Lichen and dyed sawdust. I also use a lot of natural scenery items such as dirt and small twigs. The dirt needs to be finely sifted and the color can be varied by adding appropriate amounts of colored chalk dust. When gathering scenery elements outside it is important to ensure there are no bugs in them.
Saturday, September 13, 2014
More Marion shovel photos
A friend questioned me about the authenticity of Marion shovels with the sides open. I guess we are familiar with the pristine commercial models and the Colorado narrow gauge versions. I dug though my "stuff" (I have a lot of stuff) and found two photos of shovels in use with open sides.
This shovel seems to be deep in it's work. The track appears to be temporary which was not uncommon for dig sites.
This photo is a little grainy but adequate to show the open sides of a shovel in use.
Next project
My next project is going to be a wood style warehouse to be located along the wall next to the varnish company but unrelated. I am in the process of building a card stock mockup to get the size as well as the look and feel I want. It is inspired by a photo of an old warehouse.
Next project
My next project is going to be a wood style warehouse to be located along the wall next to the varnish company but unrelated. I am in the process of building a card stock mockup to get the size as well as the look and feel I want. It is inspired by a photo of an old warehouse.
Subscribe to: