Welcome

This blog presents my thoughts, information and activities in my model railroading world.

Tuesday, January 31, 2017

Industry hat examples

I have been working on my hat factory model which is progressing slowly.  The starting point is a DPM kit which I am modifying extensively and the modifications are difficult.  I think it would have probably been easier to just scratch build the whole thing.  In any event, I am not ready to post the model itself.  Instead I am posting more examples of period industrial workers wearing hats.  But the first photo is an event in 1987 held at the Cass West Virginia railroad sponsored by the Mountain States Logging Association back in 1987 where they requested attendees to dress in period dress.  Some did including me.


In the photo above I am the third parson from the left.  That was an interesting event.

In the early to mid 1900's workers in many professions wore hats.  It was the the style of the day.


Above are workers on the Rio Grande Railroad preparing the right of way.


And here is a logging operation.


And lastly is a photo of a mining operation in South Dakota.

Wearing hats was the standard in those days thus the success of the hat industry.



Monday, January 23, 2017

Hat factory planning

When I decided to build a hat factory I had no idea of what one might look like.  It turns out some hat factories were major facilities.  As usual, my model will be a modest representation.  I am in the process of planning the model.  I did some research to help me in my planning.  Below is a business ad for Lee Hats.  As you can see the factory is quite large.


In my 1939 modeling era and many years preceding men of almost all status wore hats.  Below is an example of a working environment where the workers were wearing hats.


One of the major hat manufacturers was Stetson founded in 1865.  In the 1960's the company was absorbed by a conglomerate.  The hat making processes were interesting.  They used a variety of machinery and materials such as animal hair for felting.  The forming and coloring processes were quite involved.  There were many types of hats.  They used rows of racks and shelves for the hats as they were created.  They usually made their own hat boxes.  They used a variety of fur pelts (frequently Beaver and Nutria).   They had dye vats and stiffening processes.  The many steps were quire complex.

My initial plan for building my model is to use a modified Design Preservations Models kit for the start.  I will see how this works out.  There will be additions to the kit.  More later when I have made some progress.

SS Ltd concrete mixer completed.

I have completed this kit.


I built it as a very used machine.


The chute is in the up position since it will be sitting in the building supply company yard.

Another Aurora Snap-aroo auto kit model.

I also assembled another cheap Auroa auto kit.  Too bad this company went out of business.  As usual  I made many modifications.  The photo shows an original kit beside the finished auto.   I removed the roof and created an interior.


It is all fun!









Saturday, January 14, 2017

Building supply company complete

I have completed the building supply company and it is installed on the layout.  For the last week I have been mostly building and painting details for the yard area.  That takes a long time.  The fence around the yard is an old Alloy Forms chain link fence kit with modifications.


I have distributed a variety of building supplies around the inside of the fence and around and inside the shed area.  Some are commercial parts and some are scratch built.  I will describe a few of them.


On the right is an outhouse next to the building and to the right of the outhouse is a sand bin with a loader in front of it.  To the right of the sand bin is a stack of "concrete" water pipes.  I made the water pipes from paper straws with a strip of paper around one end for the connector to string the pipes together.  I liberally coated the pipes with tan acrylic paint.  At the near right, inside the fence, is a pile of stone blocks made from Hydrocal pieces.  In between the concrete pipe and the stones are a pile of steel beams and several stacks of bricks. On the right side of the main building there are ladders stacked.


Next to the center of the main building are stacks of concrete blocks - commercial products.  Also several commercial cable reels.


In the shed area are stacked sacks of cement,  compressed gas bottles, and some wheel barrows.

I added a number of figures, some doing work and others loafing.  If anyone has questions either, send me a Gmail or post a comment and I will answer.

Now I need to decide what my next project will be.  In the mean time I will be building an SS Ltd concrete mixer to add to the yard area.  As always,  the SS Ltd kits have great detail but are a pain to build.









Friday, January 6, 2017

Building supply workshop shed

I have added a shed to the building supply company workshop.  The photos were taken on the layout. There are still many details to be added as well as the supplies in the yard area.  As you can see this is the last business along the back of this layout section as you can see the end of layout hill on the right side.


With the shed attached, the workshop building does not look as strangely high.


The area between this scene and the front of the layout is unfinished.

After I complete this industry I will add the next layout extension making the layout in this room a "C" shape instead of the current "L" shape.  Then I will be running out of space in this second layout room.




Saturday, December 31, 2016

Building supply co work shop

This is the building supply company work shop.  It will be located to the right of the lumber shed.  The reason it is tall its there is a traveling crane inside to move materials around the shop  (it is not actually modeled since it cannot be seen).


There will be an open shed extending out from this side with machinery and materials inside.


The figure inside the door is again a modified Plasticville figure.


In this view you can see the vent fan installed and below the side window is a compressed gas container located outside of the building for safety.  Below is a photo I took years ago that was the inspiration for this gas container model.  The model was made using a cheap commercial tank and scratch built details on the top.


Above is the prototype tank taken long ago at a forgotten location.

This is the end of the year and I would like to wish all of my viewers a very Happy New Year!  My wife and I will be celebrating at home with a bottle of sparkling wine.  Tomorrow we will be going out for our traditional new years day brunch with our kids and grand kids.  I expect 2017 to be a good year with lots more modeling.  ðŸ˜„







Tuesday, December 27, 2016

Disc wheel exhaust fan model

I have constructed a vintage style disc wheel exhaust fan for the side wall of the next structure I am building.  This took a lot more time than I thought it would.  This next structure is a combination storage and work shop structure for the building supply company.



I built this starting with a ring cut from a piece of plastic tubing about 4 scale feet in diameter.  I then added cross supports for the fan hub using small wire scraps.  Lastly I made some fan blades from paper.  I made several attempts at this.  The result is OK and should look decent in the building side on the layout.


Above is a prototype of this style fan.


Above is another version of this fan in a wood frame with a steam driven motor attached.  I will have a similar frame inside my building.

I am not aware of any commercial detail part for a vent fan of this type.




Saturday, December 24, 2016

Electric platform truck model

I have built a battery operated  electric platform truck with a crane for my building supply company.  It is used to move supplies around the facility and to load and unload trucks.  Units of this type were common in the 1920's and 1930's for moving all sorts of goods.  Some trucks ere specially fitted to haul bulk items.


Above is a Crescent Crane truck which is what I based my model on.  It could carry a payload of up to 4000 lbs and lift up to 1500 lbs.  It could also tow a trailer.  The battery was located under the platform.


Above is a Elwell-Parker platform truck. This one had a smaller battery located on the platform ahead of the operator.

Below are several photos of my model.


This model is made from a hodgepodge of commercial parts and wood scraps.


The boom on the crane "supposedly" moves up and down and swivels slightly from side to side.

Next I will start on the last building which will be a somewhat smaller structure located to the right of the lumber shed and it will have an open shed attached.  After that I will place all of the components on the layout and add lots of building supply details.

Meanwhile, for all of you who celebrate it -

Have a Merry Christmas!